Individuals who own property or their designated representatives are eligible to apply if they are connected to a municipal water system and maintain an account in good standing. The project sites must be situated within a municipality or an unincorporated county area that has adopted water-efficient landscape standards. You must be pre-authorized to participate and the project must be completed within 12 months from approval date. Drip irrigation systems are required in converted areas and there are plant-coverage minimums and grass-coverage maximums. Grass is not allowed on park strips, slopes and in areas less than 8-feet wide.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *